House Remodel‎ > ‎

C. Demolition

Then it was time to tear out most of the interior.

The basement was basically stripped down to the studs and the deck and back wall were removed.  Both fireplaces and the chimney were removed and large chunks of downstairs floor were cut for relocating drain lines and pouring new foundations.


So far they have filled up almost 3 huge dumpsters with wood, pipes and drywall.  They also filled 2 smaller dumpsters with brick and concrete from the 2 fireplaces and the chunks of floor they cut out.
Comments